Find Walthall County Release Dates

A Walthall County projected release date answers when a sentenced person may leave custody, not when release has already occurred. The correct search depends on whether the person is a pretrial detainee, a locally sentenced inmate, or a Mississippi state prisoner. To find when they will be released, use the record held by the jail, sentencing court, or state corrections agency. A public estimate may move as sentence credit, court action, release eligibility, conduct, or another agency's hold changes. Final release must be confirmed through an executed release or discharge record.

Public Record Search

Sponsored Results

Walthall County Projected Versus Actual Release

MDOC uses the exact public label Tentative Release Date. It is an estimate based on the sentence and information available to MDOC. It is not a scheduled appointment, release order, or certificate that the person left. An actual Walthall County release has already occurred and is documented by a Sheriff release timestamp, an MDOC discharge certificate, or another executed movement record.

A pretrial detainee has no sentence-based date to calculate. Release may depend on bond, a dismissal, a court order, or later case action. Someone serving a local jail term requires the Walthall sentencing court's commitment and credit calculation. A state prisoner requires the MDOC sentence record. The regional Marion/Walthall County Correctional Facility houses state inmates, so its release-date route is MDOC even though its name contains Walthall.

Scheduled versus actual: A tentative date forecasts a possible event. Only the jail or MDOC execution record confirms that custody ended and whether another agency received the person.
Tentative Release Date
MDOC's public estimate for a state inmate, subject to lawful recalculation.
Release Date
The recorded time a custody event ended after processing was completed.
Parole eligibility
The point when Board consideration may occur, not a promise of release.
Discharge certificate
The MDOC document issued through final release processing.

Find a Walthall County Release Date

Identify the custody system first. The Walthall Sheriff roster, MDOC inmate search, and court files answer different questions. A person who bonded out of the county jail may have no MDOC entry. Conversely, a state inmate housed in Columbia will not have a complete discharge path in the Sheriff's short local release feed.

  1. Check the Walthall Sheriff roster selector. Current placement means the Sheriff still reports local custody; a released card records a completed local exit.
  2. For a state prisoner, open the MDOC Inmate Search. Search by MDOC number when possible, or use the exact name.
  3. Compare date of birth, sentence county, current location, entry date, and location-change date before treating the result as the same person.
  4. Read the field labeled Tentative Release Date. Do not convert it into an actual release date.
  5. For a local sentence, ask the sentencing court and Walthall jail for the commitment, eligible jail credit, and existing release calculation.
  6. When the estimate passed or changed, ask MDOC Records for the time sheet, movement record, or discharge certificate.

A full custody-system decision path is available through the Walthall County released-inmate lookup. It separates local jail, state prison, federal, and immigration custody before a date is interpreted.


Walthall County MDOC Date Fields

The MDOC detail record supplies context for its estimate. Public fields may include name, MDOC number, date of birth, physical descriptors, entry date, current location and unit, location-change date, sentence length, offense, county of conviction, sentence date, and photograph. The release estimate appears as Tentative Release Date in the current interface and Tentative Release in the legacy interface.

FieldWhat it tells the readerWhat it does not prove
Current locationThe institution or unit MDOC publicly reportsThat release processing has begun
Location-change dateWhen the listed placement changedA community release
Sentence and countyThe state term and county of convictionCurrent residence or local jail placement
Tentative Release DateMDOC's current public estimateAn executed departure or final discharge

The MDOC example detail displays the literal field used for the estimate.

Walthall County projected release date shown in an MDOC inmate result
The official detail layout distinguishes a tentative date from current location and sentence fields.

The named example documents the layout only. Its facts should not be applied to another person. MDOC's legacy result also warns that state law can cause release types and dates to differ from the web display.


Walthall County Earned Release Rules

Mississippi Code ยง 47-5-138 supplies the rule often summarized as serving 85 percent. For covered sentences imposed after June 30, 1995, an eligible inmate may earn 4.5 days for each thirty days served through good conduct and performance. The allowance is generally capped at 15 percent of the sentence. The remaining conditional period is earned-release supervision, or ERS, and the person remains under MDOC jurisdiction until expiration.

That shorthand is not a guaranteed date. The law has exceptions and amendments. Current codification includes a provision beginning July 1, 2006 for a person under twenty-one who committed a nonviolent offense, while other terms address revocation credit. MDOC's handbook identifies disqualifiers involving specified habitual, violent, sex, detainer, life-sentence, and program or status circumstances.

Meritorious earned time and trusty time are separate mechanisms with distinct rules and exclusions. Program completion must not be converted by hand into a new date. MDOC Records calculates the official time data. Parole eligibility is also distinct, and earned time does not shorten the minimum statutory parole-eligibility term.

Note: The 85-percent phrase is a broad ceiling framework for eligible state sentences, not a formula for every Walthall County inmate.


Walthall Jail Credit Changes Dates

MDOC's time calculation can include eligible pretrial or county jail credit. The credit must relate to the same cause number, and the handbook says MDOC requests it from the county of conviction. This creates a direct Walthall County link: a missing or corrected jail-credit record can move the state tentative date.

Keep the cause number with the inquiry. Ask the sentencing clerk for the commitment and any amended order. Ask the jail for the custody dates it maintains. Then ask MDOC Records whether the eligible credit was received and applied. The public web result cannot show every computation input, so a mismatch should be resolved through the records that created the calculation.

No public Walthall County jail good-time formula was verified. No county weekend-release rule was found either. The MDOC 85-percent framework must not be applied to a pretrial detainee or a short local sentence. For those records, the jail and sentencing court own the calculation.


Why Walthall Release Dates Change

A release estimate changes when one of its legal or factual inputs changes. The public date may lag behind the underlying record. A past date paired with a current MDOC facility remains a sign that state custody is still publicly reported, so MDOC Records should be asked about recomputation.

FactorPossible effectRecord to check
Corrected Walthall jail creditChanges qualifying time applied to the sentenceCause-number credit and MDOC time sheet
Concurrent or consecutive structureChanges how multiple terms combineSentencing and amended orders
Conduct or earned-time statusAdds, removes, or forfeits eligible creditMDOC computation record
Detainer or holdMay cause custody to continue with another authorityReceiving-agency or hold record
Parole or ERS actionChanges the route or conditions of releaseBoard decision or MDOC supervision record
Revocation or new sentenceMay extend custody or require recalculationCourt order and MDOC record

A detainer means another agency seeks custody. Departure from the current facility may therefore be a transfer, not community release. The receiving agency must be checked before describing the person as released.


Walthall State Release Processing

MDOC says final processing can take 30 to 45 days. A case manager gives the inmate exact release information, verifies travel plans, and handles final planning. The inmate may request a time sheet and share it. A discharge certificate accompanies release processing and is stronger evidence of the completed event than the public tentative date.

If requested, MDOC may buy in-state bus travel to the destination or the nearest city. It does not purchase out-of-state travel. These are Mississippi state-prison logistics. They are not verified practices at Walthall County Detention Center, which publishes no release-processing schedule, exit door, waiting area, property procedure, or transportation plan.

The MDOC family and friends information describes the case-manager and final-processing path. Operational details may change, so the assigned case manager should confirm the plan for a specific release.

Timing: A forecasted date can arrive before final travel, documentation, and handoff details are complete.

Request Walthall Release Date Records

MDOC public-record requests must be written and are not accepted by telephone. Use the MDOC public-records route and ask for a named existing document: the sentence computation or time sheet, movement or discharge record, and discharge certificate. Include the MDOC number, full name, and cause number. Those details connect the request to any Walthall County jail credit that MDOC sought from the county of conviction.

MDOC policy states that it responds in writing within seven working days and ordinarily produces records within fourteen working days after request or payment unless more time is needed. Mechanically reproduced pages cost $0.15 each. Qualified labor beyond the first hour and actual vendor or mailing costs may also be charged, and advance payment may apply. Ask for an estimate before work exceeds a set amount.

For a local sentence, request the commitment, custody dates, credit entry, and release calculation from the Walthall jail and sentencing court. No county-specific request form, fee schedule, or public good-time worksheet was found.


Confirm Walthall County Release Dates

Use the record that proves the event. For a local jail exit, the official Walthall 48 Hour Release card may show an exact timestamp while it remains online. The Sheriff release sheet or log entry is the historical fallback. For a state inmate, ask MDOC Records for the time sheet, movement or discharge record, or discharge certificate. A tentative date by itself cannot establish a completed release.

VINELink can provide a custody-change alert for participating Walthall or MDOC records. It is a notification service, not the certified order. Register on the person's record, preserve the event time, and confirm the event with the agency that supplied it. The VINELink Check explains the person-specific notification path.

County jail, state prison, and federal dates should never be merged. BOP uses its own federal locator, and ICE custody has a separate system. A state release does not rule out another agency's hold. Each result proves only what the named authority reports.

Note: Ask for existing documents and exact field labels, since an agency need not create a custom sentence calculation for a requester.

Public Record Search

Sponsored Results